Sequencing installs by proximity instead of booking order, how equipment constrains a route, and closing a job out properly.
Read article →Material never landed. Site not ready. Nobody confirmed the homeowner. That is a fence crew paid to wait. J TecHive coordinates the details for fence contractors before the truck rolls, and closes the job out after.
The contract is signed and the money is committed. The job still does not move until someone works through the same short list, every time.
"Nobody confirmed the locate. We cannot put a crew on an unmarked line."
"Material went to the wrong address. Crew is sat in the truck."
"Homeowner did not know we were coming. Dogs out, gate locked."
None of that is a building problem. It is an office problem that arrives on site.
Each step has a status and an owner. A job that is not clear does not get a crew, and a job that is built but not closed out is still an open job.
The crew should not have to call the office to find out what the office already knows. Everything below goes out before install day.
Crew notes. Dogs on site, homeowner will secure before 8am. Slope on the north run, expect stepped panels. Neighbour fence ties in at the northeast corner, do not remove.
Jobs are grouped geographically where the schedule allows, so a crew is not crossing the county between two installs that sit four miles apart. Install dates are set against material readiness and production capacity rather than whoever signed first.
Production never runs the calendar you built on Monday. What matters is that when something moves, everyone who needs to know finds out the same day.
On most jobs the larger half of the money sits behind a walkthrough that nobody has booked. The crew has moved to the next install, the invoice has not gone out, and the balance quietly ages.
We do not take payments, hold funds, or act as your company. We book the walkthrough, confirm the work is accepted, trigger the invoice inside your system, track what is outstanding, and follow up until the job can actually be closed.
One job. One source of truth.
The job information follows the project from sold work into the field, through the walkthrough, and out at closeout.
Routing, material timing and what happens after the crew leaves the site.
See where your current production coordination is costing you days, drive time, or return trips.